The Langnau WWTP treats wastewater from the region, consisting of the municipalities of Langnau, Trubschachen, Trub, Escholzmatt-Marbach and Schangnau. More than 15,000 people live in this catchment area and over 150 businesses are connected to this wastewater network, which corresponds to 30,000 population equivalents.
Part of the overall renovation of the Langnau WWTP
One component of the overall ARA Langnau project is the replacement of the control system in the Marbach pumping station. Until now, the integration of the alarm system was not possible and had to be managed separately.
The ALLinONE control system was installed in just one day. The flexible configuration options make it possible to connect the outstation, including alarms, to the new PLS at WWTP Langnau without the need for complex programming.
More functions. More comfort. More safety.