PLC controls, ARAbella process control system, STEBalarm, Pneumatic discharge control TFPNA
The catchment area extends from Brienz to Axalp via Schwanden and Hofstetten. STEBATEC has already carried out the electrical planning mandate and will now also implement the control and instrumentation technology, as well as the STEBATEC IT and network concept. Two TFPNA pneumatic flow controllers will be used for water distribution on two roads and for precise flow measurement.