The waste incineration plant in Basel is operated by IWB, the Basel industrial works. In cooperation with Saacke Switzerland, STEBATEC was able to equip four pilot and support burners of the furnace lines with new control technology for IWB. With new control cabinets, interfaces to the existing process control system and rapid commissioning during the overhaul of the kiln lines, the plant was brought up to the state of the art.